If I decided to show up in Rochester...can you cum for me?

Amber Does's Avatar
just don't chisel those "future trip" rates into stone ...ijs Originally Posted by JONBALLS

Lol I had no idea what to set them at
Im horrible at that and trying to give a deal but not fuck myself... I always go to gia... what would you charge for xxhours...... lol

What would be better reasonable rates than mr? Please tell me whats wrong with them as well... im not thw best at math and it was realllly early and no sleep lol
Amber Does's Avatar
Touché

Originally Posted by JohnnyCap
Get that shit out my thread
Lol I had no idea what to set them at
Im horrible at that and trying to give a deal but not fuck myself... I always go to gia... what would you charge for xxhours...... lol

What would be better reasonable rates than mr? Please tell me whats wrong with them as well... im not thw best at math and it was realllly early and no sleep lol Originally Posted by Amber Does
I will try to give you some constructive criticism on rates. What is wrong with your rates as you set them is that they are irrational. Mind you, I don't care what you decide your baseline hourly rate is worth. That is up to you, but the rates should make sense once you set an hourly rate.

What I mean is that your first hour should be your most expensive right? You want to encourage longer dates. The theory is that your second hour should be cheaper than your first as a two hour date for one guy should be less than 2 one hour dates for two different guys since you don't have to get ready a second time for a 2 hour date. Therefore your rate structure of :

1 hour -- 180
90 minutes -- 300
2 hours -- 360

makes no sense as you are charging the same for a 2 hour date as you are for 2 one hour dates. Even worse, the 300 for 90 minutes actually means you charge 180 for first hour and then 120 for the next 30 minutes. Therefore your rate is only 90 bucks per 30 minutes for the first and second half hour and then goes up to 120 for the third half hour. Then if you extend to 2 hours, it goes down to 60 bucks.

If you want to encourage longer dates, make the rates less for all time increments beyond hour one. For example:

1 hour -- 200
90 minutes 280
2 hours 350

As you see, that encourages the guys to book longer as they get a bit of a break the longer they book. If you want to encourage even longer dates, then say 120 per hour beyond the 2 hours or set a fixed rate for an over night if more than 4 or 6 hours etc.

Hope that helps.
Plastic Man's Avatar
uh jimmie task ...dont argue with ...funnel economics or ...funnel logic
Amber Does's Avatar
I will try to give you some constructive criticism on rates. What is wrong with your rates as you set them is that they are irrational. Mind you, I don't care what you decide your baseline hourly rate is worth. That is up to you, but the rates should make sense once you set an hourly rate.

What I mean is that your first hour should be your most expensive right? You want to encourage longer dates. The theory is that your second hour should be cheaper than your first as a two hour date for one guy should be less than 2 one hour dates for two different guys since you don't have to get ready a second time for a 2 hour date. Therefore your rate structure of :

1 hour -- 180
90 minutes -- 300
2 hours -- 360

makes no sense as you are charging the same for a 2 hour date as you are for 2 one hour dates. Even worse, the 300 for 90 minutes actually means you charge 180 for first hour and then 120 for the next 30 minutes. Therefore your rate is only 90 bucks per 30 minutes for the first and second half hour and then goes up to 120 for the third half hour. Then if you extend to 2 hours, it goes down to 60 bucks.

If you want to encourage longer dates, make the rates less for all time increments beyond hour one. For example:

1 hour -- 200
90 minutes 280
2 hours 350

As you see, that encourages the guys to book longer as they get a bit of a break the longer they book. If you want to encourage even longer dates, then say 120 per hour beyond the 2 hours or set a fixed rate for an over night if more than 4 or 6 hours etc.

Hope that helps. Originally Posted by Taskmaster
Thanks Task I appreciate it. I dont know why it has been so hard for me to do before. I suck at numbers and basic math.
JohnnyCap's Avatar
Touché

Originally Posted by JohnnyCap
Get that shit out my thread Originally Posted by Amber Does
Amber Does's Avatar
That one...not so bad
JohnnyCap's Avatar
Talk about ass threADs